Jason Koertge of PCBDaily.com recently stopped by the Casa to check it out. Jason has a great new online news publication going that is doing a great job covering all the "going ons" on our end of the beach and beyond. I have come to rely on PCBDaily.com to keep me abreast of all the happenings in Panama City Beach such as the coverage on the real estate market, local government issues, the new airport project, and what's happening in and around the Pier Park area.
Jason did a nice plug on his site for the Casa de Maraposa project. His interest in modern design and construction and new ideas that appeal to the beach housing market were all discussed during his visit. We had a good discussion on the how's and why's of what we built in Laguna Beach and he included some nice pics in his story. It was a busy day there when he arrived as we were joined at the same time by some neighbors and the pest control man (whose job was made really easy since the Casa does not contain any termite food!!).
The link to Jason's site report is: http://pcbdaily.com/?p=3112
Just wanted to thank Jason for stopping by and for his hard work to keep us all informed on whats happen at the beach. There is a link on this blog to his site - PCBDaily.com
Saturday, October 04, 2008
Tuesday, June 24, 2008


Thursday, March 06, 2008

Friday, January 25, 2008
So, its been a while since the last update. But here up will find a fast-tracked update on what's been happening on the Casa since November. There has been many decisions: some good one's and some that I will chalk up to part of the learning process that I agreed to myself that this home would provide for me. Afterall, it is my first 'greenfield' job and also it has been intended as an exercise in new construction methods, an aggressive budget, and introducing "green" to the neighborhood.
We have changed decisions on the facade, the fence, the interior paint, the countertops, the bath tile, lighting, landscape, and so on. But who ever said these were really decisions to begin with? They were only ideas that evolved along the way. These have been driven by costs, subs capabilities, simplicity, and other factors. But all in all the Casa de Mariposa is mostly as it was originally designed and with that, I am pleased so far. I will attempt to place the folowing pics in somewhat a chronological order and will try to hold the comments to a minimum.
I hope for your feedback, questions, and comments.
Monday, November 05, 2007
Sunday, September 09, 2007
Friday, September 07, 2007
Thursday, August 30, 2007
Thats what having these panels go up reminds me of when we have several guys lift and then walk the wall up in place. The home is beginneing to look like a home. The comments and looks we are getting from passer-bys are priceless. There have been a few hurdles so far with learning curve and panels manufacturer, but we are getting through them, at least for now. These are pictures from days 1 and 2. Previous to these past two days, the base track was installed on the slab and the slab was covered for protection.


Saturday, July 28, 2007


Wednesday, July 18, 2007


Today the temprary power pole went up and hopefully the surveyors will be out to make a new survey of the lot and mark the corners of the house and pool. Working with the older survey, combined with the home and pool being set at minimum lot setbacks, it seems it will be $300 well spent now to avoid possible discrepancies later. Here are a few updated renderings of the Casa de Maraposa.
Wednesday, July 11, 2007

The building permits were submitted and approved in less than 2 weeks! As of Monday July 9th, we have been issued our building permit by Bay County. As far as I know from our contractor, there were no questions or issues brought up which I find somewhat amazing since this is a different type of construction method that the traditional stick build that these guys see everyday. Lets hope that this will not come back to haunt us during the construction phase when the individual inspectors seem to have their individual interpretation of the codes. But as far as the structure and site planning, I will assume they are happy with what we submitted and I am hopeful that they are as excited to see something "new" being built as we are.
As we begin on this project, I wil be updating regularly with photos and logs to document this project and hope that you will join in with you comments and questions.
Next on the agenda is 1. Getting the building panels on order from Transcon in Austin TX. http://www.transconsteel.com/ Yet, in speaking with Transcon this week, it seems that they have great new capacity in their new plant and the delivery time will be faster than what we will need. We don't want to store the panels on site but also don't want to be waiting on them. Thus schedule planning is crucial for an efficient project.
We will also be getting the pool permit and then marking the corners of the slab so that the pool (though small as it is) can be laid out and roughed in before the house foundation. This is due to the lack of accessability to the pool after the slab goes in.
Greg and Rusty (Arbor Homes), the contractors, will be getting temporary power out to the lot right away. Speaking of Greg, I had a great discussion with him today regarding our ability to meet more than the minimum number of points to achieve the Florida Green Building Coalition certification. I have been pleased with Gregs willingnes to "think out of the box" so far on this project. I know that he too feels that there has got to be a better way to build here on the coast that is green, cost effective, and strong while remaining easy enough to meet various types of architectural styles and tastes. Chandra Hartman of http://www.cfhdesignstudio.com/ is helping us along with the "green certification" and she plays a vital roles in seeing this project finally come to fruition.
So for now I leave you with a shot of the beach that lies only a couple hundred yards from the soon to be Casa de Marposa. Stay tuned...
Thursday, June 21, 2007
Tuesday, May 15, 2007
After a few delays, we should have the engineering and drafting data from Enerloc this week. Once in hand we will review these drawings and give the OK to produce the stamped engineers layouts of the Enerloc build envelope. These, along with the the site plans, material schedule, utility layouts, and septic information, will all be delivered to the local code officials in Bay County to get their blessings. While we wait for the local code officials to approve (glass half full :), I will be looking at every aspect of this project where we can find some additional cost savings. Once the local code dudes have signed off and we have a permit, then we can let an order to Enerloc to manufacture the wall and ceiling panels and being site preps.
I have been soliciting some infomation from members at LiveModern.com on fence ideas and they have come up with some great resources. I especially like the use of framed translucent panels (FRP, Poly, etc) as well as some of the new bamboo fencing. There is some great info on these at lottalivin.com as well. So stay tuned - things have picked up to snails-trot pace now.
Thursday, April 19, 2007



The Casa de Maraposa is slowly coming into a project. Gues you could say its still in the cacoon.
After much ado about windows and finding the right supplier for the impact sliders we want, and of course with price being a factor, we are on to the next step. This entails the drawings from CFHDesignStudio being sent to Enerloc (along with some of my $$) in Austin, TX to have the drafting and engineering services done. The guys at Enerloc, who I have yet to meet personally, have been great through all this planning stuff. And I really hope that the material quanities and deign work come back in line with the original estimate +/-5%. I should have some response from Enerloc in about another week. Enerloc is providing the complete panelized building envelope. They have an all steel and foam injected panel system - not a SIPS - but similar in that its panelized and should go up quickly while reducing waste and labor and creating a strong and energy efficient structure.
Greg Mahar at Arbor Homes in Grayton Beach has put together an estimate for construction that is, so far, within our target. He seems determined to look for economies in this new method of construction - at least new for this area.
Chandra Hartman of CFHDesign Studio is really ready to see this whole project come together. This gal has some great ideas and I hope we can get this one off the ground and move to #2.
I have included the preliminary plans that have been submitted to Enerloc for drafting and engineering of the panalized building envelope.
In the meantime, I am still working on the money side of this. Ugh.....